GUITAR CENTER

Location: Dublin, CA
General Contractor: Whiting-Turner
Architect: MCG Architecture

This project consisted of (1) retail building (approx. 15,000 SF) including site utility, landscape, joint trench, and grading work. The structure of the buildings is a wood frame system along with (1) CMU trash enclosures. The exterior of the building consists of stone veneer, brick veneer, glass and glazing, plaster and paint.
Laser screed slab pour